Step 1

Design

  • Design product
  • Design mould

Step 1

Design

Step 2

Approval

  • Approval design product
  • Approval mold concept & design
  • Approval product weight

Step 2

Approval

Step 3

Schedule plan

  • Schedule timeline until trial 1 matching with customer schedule
  • Order mold material
  • Order mold parts

Step 3

Schedule plan

Step 4

Start Process Making Mould

  • Start cutting material (milling, turnmill, EDM) until finish
  • Checking after machining the target of dimension
  • Polishing product area after process finishing for target visual product

Step 4

Start Process Making Mould

Step 5

Final Checking & Assembly

  • Final checking all parts after machining & polishing
  • Assembly all parts become 1 set mold
  • Prepare for trial 1

Step 5

Final Checking & Assembly

Step 6

First Trial New Mould

  • Check mold mechanism
  • First trial injection looking for first product
  • Analysis the product compare with customer needs & approval to customer the result after trial
  • Fixing problem if there are some problem in first trial until we get a good quality of product and a good mold before mass production

Step 6

First Trial New Mould

Step 7

Final Trial Before Mould Send to Customer

  • Final checking all parts of mold
  • Final trial before mass production
  • Make sure everything running smooth
  • Final checking a finish goods compare with customer needs

Step 7

Final Trial Before Mould Send to Customer

Step 8

Final

  • Mold ready to mass production / send to customer side
  • If mass production in customer side, we will send our staff to handle the trial in customer side until ready for mass production

Step 8

Final

PT. Akurasi Semarang Teknologi Indonesia

Merupakan sebuah perusahaan manufaktur bersertifikasi International yang bergerak dibidang pembuatan mould, mass production precision parts, fabrication dan mass production injection plastic baik itu untuk cosmetic packaging, electronic parts, automotive parts, dan general product lainnya.